Year-end reporting and new compliance budgets can compress reviewer availability. Confirm the engagement team and evidence dates before January.
When should you book your SOC 2 audit?
Use published firm timelines as a starting point, then obtain dated commitments for fieldwork, review and report delivery.
A practical window for first-audit scoping and readiness work when a year-end report is not required.
Secure fieldwork and review dates now if customers or renewals require a report before year end.
Do not rely on a verbal delivery estimate. Put evidence, fieldwork, exception review and report dates in the engagement letter.
Published audit timelines
These are profile records, not live capacity promises. Ask each firm to confirm dates for your scope.
| Firm | Published timeline | Audit types | Company fit | Record freshness |
|---|---|---|---|---|
| 3–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 3–12 wkConfirm in proposal | Type I · Type II | 50–5000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 13–26 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 8–16 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–9 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 3–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 3–9 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 8–16 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–13 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–13 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 5–13 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 3–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–9 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 3–9 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 3–4 wkConfirm in proposal | Type I · Type II | Under 50 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–11 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–13 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–9 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–11 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 3–7 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–9 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 8–16 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–16 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–18 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 10–24 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–14 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–11 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 8–16 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 26–52 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 5–13 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 8–16 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 1–7 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-09-27 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| Quote requiredConfirm in proposal | Type I · Type II | 10–500 employees | 2026-09-30 | |
| 2–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–20 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–18 wkConfirm in proposal | Type I · Type II | 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 26–52 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–13 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 5–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 5–7 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 3–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 3–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–11 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| Quote requiredConfirm in proposal | Type I · Type II | 20–1000+ employees | 2026-09-30 | |
| 4–10 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 10–24 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 12–52 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–8 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 8–20 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 10–24 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 4–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 4–11 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 6–14 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees · 1,000+ employees | 2026-10-12 | |
| 6–12 wkConfirm in proposal | Type I · Type II | 50–500 employees · 500–1,000 employees | 2026-10-12 | |
| 2–6 wkConfirm in proposal | Type I · Type II | Under 50 employees · 50–500 employees | 2026-10-12 |
How to read this: a published duration is not the same as current availability. Your contract should separate readiness, observation period, fieldwork, management responses, quality review and final issuance.
Ask for the full schedule
Get separate dates for readiness, the observation period, fieldwork, management review and final delivery. This makes quotes much easier to compare.
Booking for Q4 or Q1?
Ask who will be assigned, when evidence is due, how quickly exceptions will be reviewed and whether quality review capacity is already reserved.
Share your target report date and company scope. We’ll build a focused shortlist.